This system, which is among the modern prefabricated Deconstructions, offers superior features in terms of durability, safety and aesthetics. These structures, where light steel frame and prefabricated construction techniques are used, are designed in accordance with various climatic conditions. 1. these structures, which are resistant to extreme earthquake zone and difficult weather conditions, offer long-lasting and safe living spaces.
Carrier System and Structural Strength
The load-bearing system of the structure is constructed with light steel frame technique. snow load of 100 kg/m2, wind speed of 90 km/h and 1. steel columns and trusses designed according to earthquake zone standards increase the strength of the structure. This system, which is protected with a special lining against rust, provides safe use for many years.
External and Internal Walls
The exterior and interior walls with high insulation properties are made of cemented particle boards (Concrete). These sheets are resistant to moisture, water and heat. In addition, safe living areas are being created with sound insulation and flameless properties. The interior walls also have similar properties, and in addition, insulation is provided with B-1 class polystyrene rigid foam. Oct.
Roof and Ceiling Systems
The roofs are supported with light steel truss systems and high durability is provided with waterproofing membrane and shingle coating. In addition, roof insulation is made with 80 mm glass wool. The ceilings are covered with drywall and insulated with fireproof A-class glass wool.
Doors and Windows
The outer doors are metal-steel cased, while the inner doors consist of American panel doors. The windows are PVC joinery, double glazed and optional flapper and color options are offered.
Electrical and Plumbing
The electrical installation is furnished with TSE approved materials for safe use. The plumbing is equipped with modern equipment such as a shower tray, sink and toilet bowl in the bathrooms.
Floor and Paint
The rooms and halls are covered with laminate flooring, while the wet floors are covered with ceramics. All the walls have been painted with a double layer of plastic paint, and a durable and aesthetic appearance has been achieved.
Assembly and Construction Process
The product is mounted with a steel bolt on a pre-prepared concrete pedestal. Easy installation and fast production process offer a comfortable and safe living space to its users.
Warning: It is recommended that you do not make any payment (deposit, advance, etc.) before visiting the actual area (workplace, shop, etc.) where the advertiser offers his goods and services to the relevant parties and before receiving the goods and services you want to buy.